We are proud to report the successful commissioning of an H₂ peak-load heating system from our system partner Hyting at the Markkleeberg site of BURO GmbH.
The overall system has a nominal heating output of 120 kW for the base load, provided by three heat pumps. This is supplemented by two 40 kW hydrogen modules from our partner Hyting to cover peak loads. The building management system synchronizes the interaction between the heat pumps and the H₂ peak-load heating system, while a higher-level energy management system coordinates the grid-friendly use of low-cost green energy for hydrogen generation. In Phase 2 of the project, starting this year, increased hydrogen electrolysis capacity will help reduce the peak load demand of the production facility in a cost-efficient manner, marking another step toward energy-autonomous and emission-free production. The system is available for viewing by appointment—we look forward to your interest.
H2greenPlanet GmbH also participated in one of Europe’s most important hydrogen conferences—the Hydrogen Days 2026 in Prague—as part of a technical presentation. Representatives from industry, research, and user sectors gathered for their annual exchange on the state of the art and practical experience in operating hydrogen-based energy generation systems in the fields of facility management and mobility.
Join our Open House events! Starting immediately, we warmly invite you every Friday from 10:00 a.m. to 4:00 p.m. to visit our offices in Winden and Wismar The goal of these informational events is to provide interested parties with insights into the technology and available products, with a focus on application areas, benefits, and performance data.
To help us plan, we kindly ask you to register at:
Best wishes
Your H2gP Team


